Project management · Free online course

Mechanical Completion and Pre-commissioning: ITRs, Punch Lists and Handover

Take a system from construction to handover the way an oil, gas, petrochemical or power project expects: systems and subsystems and their boundaries, the completions database with tag registers and A and B ITRs, walkdowns and A, B and C punch lists, piping reinstatement after hydrotest, water flushing and air blowing, lube-oil flushing to an ISO 4406 cleanliness class, alignment and run-in of rotating equipment, E&I pre-commissioning and energisation, isolations, permits and LOTO, the MC certificate, RFC and RFSU, and the handover dossier.

  • 9 modules
  • About 2 hours of lessons
  • Beginner
  • English
  • ₹0, free
Mechanical Completion and Pre-commissioning: ITRs, Punch Lists and Handover course cover

₹0Free for good

Worth ₹1,999 by length and depth against classroom training. It has always been free; that is not a former price.

No card. Checkout takes a minute and gives you a receipt.

Certificate ₹959, optional. The course is free either way.

Overview

About Mechanical Completion and Pre-commissioning: ITRs, Punch Lists and Handover

Take a system from construction to handover: systems, ITRs, punch lists, flushing, E&I checks, safety, certificates and the dossier.

Mechanical Completion and Pre-commissioning: ITRs, Punch Lists and Handover is a free, self-paced online course from EDWartens for mechanical, piping, electrical and instrument graduates, QA/QC and construction engineers, and technicians moving into completions, pre-commissioning or commissioning on oil, gas, petrochemical and power projects. It has 9 modules and takes about 2 hours of lessons and practice, plus about 2.5 hours of optional video, with written notes, a practice task per module, a practical project and a final assessment of 15 questions (pass mark 60%). Learning costs nothing and needs only a free account. The optional EDWartens Certificate of Completion, verifiable by code, is a one-off ₹959 inclusive of GST for learners in India; it is not a vendor credential. Updated 28 November 2026.

Who it is for: Mechanical, piping, electrical and instrument graduates, QA/QC and construction engineers, and technicians moving into completions, pre-commissioning or commissioning on oil, gas, petrochemical and power projects

This course includes

  • About 2 hours of lessons and practice, plus about 2.5 hours of optional video
  • 9 modules with written notes and diagrams
  • One final assessment: 15 questions, pass mark 60%
  • Ask-an-engineer support from practising engineers
  • Lifetime access, the course does not expire
  • Optional verifiable certificate when you finish
  1. Step 1 of 3

    Learn the 9 modules

    About 2 hours of lessons and practice, plus about 2.5 hours of optional video, with written notes and a practice task per module, at your own pace.

  2. Step 2 of 3

    Pass the final assessment

    15 questions drawn from every module, pass mark 60%, 3 attempts.

  3. Step 3 of 3

    Take the certificate, if you want it

    Optional, paid once, only if you choose it. The course stays free either way.

    See the certificate and its price

A look inside

Mechanical Completion and Pre-commissioning: ITRs, Punch Lists and Handover: Syllabus at a glance
Syllabus at a glance
Mechanical Completion and Pre-commissioning: ITRs, Punch Lists and Handover: What you will be able to do
What you will be able to do
Mechanical Completion and Pre-commissioning: ITRs, Punch Lists and Handover: Tools and credits
Tools and credits

From the lessons

  • Pre-Commissioning vs Commissioning - What Takes Place During Each Stage?

    Completions on a project: MC, pre-commissioning, commissioning, systems and subsystems

    by ICxA

  • Mechanical Completion Explained | ITRs, WinPCS & Punch Killing (Part 1)

    The completions database, tags and ITRs

    by Offshore Engineering Academy

  • PUNCHLISTING with Peter Gilmour - Commissioning Training

    Walkdowns and punch lists: categories A, B and C

    by CommissioningCoach.com

  • @pipingknowledge5360What is piping reinstatement? Reinstatement work,Piping Reinstatement.#piping

    Piping: reinstatement, flushing and blowing

    by Piping Knowledge

  • High Velocity Oil Flushing by TFC

    Rotating and static equipment pre-commissioning

    by PetroPages Industrial Marketing

  • Learn Practically How to Check Motor with Insulation Tester @TheElectricalGuy

    E&I pre-commissioning and energisation

    by The Electrical Guy

Lesson frames belong to the creators named in the Credits and are shown from YouTube.

What you learn

What you will be able to do

By the end you will be able to:

  • Split a plant into systems with boundaries and explain MC, pre-commissioning and commissioning
  • Build a tag register, issue A and B ITRs and track weighted progress
  • Run a walkdown and write, categorise and close A, B and C punch items
  • Reinstate, flush and air blow pipework, and flush lube oil to ISO 4406
  • Test insulation and loops, control isolations, and issue the MC certificate and dossier

How it works

How this course works

  1. Watch the lessons

    Short video lessons, one module at a time, at your own pace.

  2. Read the notes

    Open the Reading tab for the written notes and diagrams of the module.

  3. Check yourself

    Answer the questions to see what stuck before you move on.

  4. Final assessment

    Pass the final once you have been through the modules.

  5. Certificate, if you want oneOptional

    Optional, with a page anyone can use to verify it.

Syllabus

Course content, module by module

In order, at whatever pace suits you. Each module ends with a practice task that builds on the last.

Modules
9
Optional videos
21
Lessons and practice
2 hours
Final questions
15
  1. 01

    Completions on a project: MC, pre-commissioning, commissioning, systems and subsystems

    2 optional videos · 14m
  2. 02

    The completions database, tags and ITRs

    1 optional video · 6m
  3. 03

    Walkdowns and punch lists: categories A, B and C

    1 optional video · 17m
  4. 04

    Piping: reinstatement, flushing and blowing

    3 optional videos · 29m
  5. 05

    Rotating and static equipment pre-commissioning

    4 optional videos · 17m
  6. 06

    E&I pre-commissioning and energisation

    3 optional videos · 27m
  7. 07

    Safety during commissioning: isolations, permits and LOTO

    4 optional videos · 26m
  8. 08

    The MC certificate, RFC, RFSU and the handover dossier

    3 optional videos · 11m
  9. Final assessment · 15 questions, pass mark 60%

Project

The course project

Optional practice that ends in the kind of job the course prepares you for, with the documents that go with it.

About 5 hours

System handover pack for a cooling water circulation system: boundary, ITR register, punch list, test evidence and MC certificate

Act as the completions engineer for System 5100. Draw its boundary, build the ITR register and its weighted progress, sort twelve punch items, judge the flush, insulation and loop records, and decide whether the MC and RFC certificates can be signed.

This project at a glance
  1. 6documents in the pack
  2. 6steps to follow
  3. 6things to hand in
  4. 5 hof work, at your pace

Sample document pack, 6 documents, filled in for the scenario

  • RegisterSystem 5100 scope sheet and candidate boundary points, Kestrel Polymers
  • RegisterITR matrix and status by tag class, System 5100
  • Punch listWalkdown notes, System 5100, 9 December 2026
  • Test reportTest records: flush, insulation resistance and loop check, System 5100
  • ProcedureCompletions rules and limits (extract), Kestrel Polymers
  • Handover certificateMechanical completion certificate (sample), System 5300 fire water jockey pump

Read inside the course and download as a workbook. The project is optional practice, marked when you submit it; the certificate needs only the modules and the final assessment.

Tools

Software, hardware and lessons

Software

A spreadsheet (LibreOffice Calc is free) for the tag register, the ITR register, the punch list and the calculations. Nothing else is needed. Real projects use a completions database; the course explains what it holds, so you can work in any of them.

Hardware

None. If you work on a construction or commissioning site, the practice tasks are better for it, but every task can be done on paper.

Who it is for

Beginner to intermediate. For mechanical, piping, electrical and instrument diploma and degree graduates, QA/QC and construction engineers, and technicians moving into completions, pre-commissioning or commissioning on an EPC project. You should know what a pump, a valve and a P&ID are; no completions experience is needed.

Video lessons by

  • ICxA
  • Project Learning Tips & Tricks
  • Offshore Engineering Academy
  • CommissioningCoach.com
  • Piping Knowledge
  • ALCHEMY ACADEMY
  • mk
  • Donaldson Hy-Pro
  • Acoem USA
  • Sulzer
  • The Electrical Guy
  • instrulogic
  • Keentel Engineering
  • The HSE Coach
  • DesiGn HuB
  • Mechanical Guider
  • OQSHA - Quality & Safety
  • Mechanical Completion - Master Talk
  • QAQC Files

Independent creators, credited in full under Credits.

Software you need

What to download, where from, what it costs and how to install it. Every link goes to the maker's own site, never a mirror.

Nothing to install

A spreadsheet is enough for the tag register, the ITR register, the punch list and the calculations. If you work on a construction or commissioning site, the practice is better for it, but every task can be done on paper.

Optional

Useful, not needed to finish the course.

  1. 01

    LibreOffice

    The Document Foundation

    Free
    Runs on
    Windows 10 or 11, macOS 11 or newer (Intel or Apple silicon), Linux
    Account
    None needed
    Size
    up to 1.5 GB of disk space on Windows

    LibreOffice is free, open-source software under the Mozilla Public License 2.0, for any use including business. Calc is its spreadsheet.

    Official download pagelibreoffice.org

Checked against each maker's own page on 27 September 2026. Trial lengths and editions change; the maker's page is the final word.

What you walk away with

Your certificate for Mechanical Completion and Pre-commissioning: ITRs, Punch Lists and Handover

Finish the course, pass the final, and this is the document with your name on it.

Sample Wartens Certificate of Completion for Mechanical Completion and Pre-commissioning: ITRs, Punch Lists and Handover, issued through the EDWartens training portal
Sample. The issued certificate carries your name, your final score, a unique certificate ID and its own QR code.
  • Verifiable by anyone

  • Adds to LinkedIn in one click

  • QR code on the certificate

  • Names what you can do

  • A permanent link

  • Earned, not attended

Learning is free. The certificate is optional.

Add it now and pay only when you have finished the course, or come back for it later. One-off, US$26.49, with a receipt.

Issued by Wartens Ltd (England and Wales, company no. 15262249) through the EDWartens training portal, as a Certificate of Completion for this self-paced course. Sold in India by Wartens Automation Private Limited. It is not a vendor certification, a university award or a CPD-accredited activity, and it does not certify competence on live equipment. Delivered electronically; see the refund policy.

Why learn with EDWartens

What you get with this course.

  • Free from the first lesson to the final assessment.
  • Video lessons with written notes and a project.
  • An optional certificate that anyone can verify online.

FAQ

Common questions

Who is this mechanical completion course for?

It is for mechanical, piping, electrical and instrument graduates, QA/QC and construction engineers, and technicians who are moving into completions, pre-commissioning or commissioning. You should know what a pump, a valve and a P&ID are. No completions experience is needed.

Is the course free to learn?

Yes. Every module, the notes, the worked problems, the project and the final assessment are free. You only need a free spreadsheet. The certificate is optional.

Does it teach a particular completions software?

No. It teaches what a completions database holds and how tags, systems and ITRs link, so you can work in any of them. Real projects use a purpose-built package, and a small job can use a spreadsheet.

Do all projects use the same ITR and punch codes?

No. The A, B and C codes in the course are typical, and each project defines its own. The course shows how to apply a rule by risk. Always read the completions procedure of your own project first.

Is this a commissioning certification?

No. It is not a certification, and it does not award any third-party commissioning or inspection credential. You get an EDWartens Certificate of Completion, with a number anyone can verify on our site.

What certificate does the Mechanical Completion and Pre-commissioning course give?

An EDWartens Certificate of Completion, issued when you finish the modules and pass the 15-question final at 60 percent. It has a number anyone can verify on our site. It is not a third-party qualification.

How long does the Mechanical Completion and Pre-commissioning course take?

The lessons and practice take about 2 hours. The video is optional: about 2.5 more hours if you watch all of it. The optional project takes about 5 hours more.

What is the project in the Mechanical Completion and Pre-commissioning course?

You act as completions engineer for a cooling water circulation system. You draw its boundary, build the ITR register, sort the punch list and test the flush and oil results. You then decide whether the MC certificate can be signed.

Is the Mechanical Completion and Pre-commissioning course free in India, and what does the certificate cost?

Yes. Learning costs ₹0 in India: every module, the written notes, the practice tasks and the final assessment, with no card and no trial period. The only paid item is the optional EDWartens Certificate of Completion, ₹959 including GST for this beginner course, paid in rupees through Razorpay, and only if you want it after passing the final assessment.

What topics does the Mechanical Completion and Pre-commissioning course cover, module by module?

The Mechanical Completion and Pre-commissioning course has 9 modules. It opens with "Completions on a project: MC, pre-commissioning, commissioning, systems and subsystems", goes through "The completions database, tags and ITRs", "Piping: reinstatement, flushing and blowing", "E&I pre-commissioning and energisation" and "The MC certificate, RFC, RFSU and the handover dossier" and ends with "Final Assessment". The full list with minutes is under "What you learn" on this page.

What can I do after the Mechanical Completion and Pre-commissioning course?

After the Mechanical Completion and Pre-commissioning course: Explain how mechanical completion, pre-commissioning and commissioning differ and where care and custody move; Split a plant into systems and subsystems with boundaries at real isolation points on P&IDs and single-line diagrams; Build a tag register and an ITR register with A and B check sheets and track weighted progress. These are the practical outcomes the course is written around, and the final assessment of 15 questions checks them.

What software and hardware do I need for the Mechanical Completion and Pre-commissioning course, and does it cost anything?

For the Mechanical Completion and Pre-commissioning course, software: A spreadsheet (LibreOffice Calc is free) for the tag register, the ITR register, the punch list and the calculations. Nothing else is needed. Real projects use a completions database; the course explains what it holds, so you can work in any of them. Hardware: none. If you work on a construction or commissioning site, the practice tasks are better for it, but every task can be done on paper. The course itself is free.

Is the Mechanical Completion and Pre-commissioning course suitable for me, and what level is it?

Mechanical Completion and Pre-commissioning is rated beginner. Beginner to intermediate. For mechanical, piping, electrical and instrument diploma and degree graduates, QA/QC and construction engineers, and technicians moving into completions, pre-commissioning or commissioning on an EPC project. You should know what a pump, a valve and a P&ID are; no completions experience is needed. It is written for mechanical, piping, electrical and instrument graduates, QA/QC and construction engineers, and technicians moving into completions, pre-commissioning or commissioning on oil, gas, petrochemical and power projects, and takes about 2 hours of lessons and practice, plus about 2.5 hours of optional video, at your own pace.

Which jobs use the skills from the Mechanical Completion and Pre-commissioning course?

Skills from the Mechanical Completion and Pre-commissioning course (for example: explain how mechanical completion, pre-commissioning and commissioning differ and where care and custody move) are used in completions engineer work. The course gives you practical evidence of the skill; it does not promise a job, and employers decide on experience and interview.

All course facts
Price
₹0, free for good. No trial, no card. Comparable classroom training of this length costs about ₹1,999.
Who it is for
Mechanical, piping, electrical and instrument graduates, QA/QC and construction engineers, and technicians moving into completions, pre-commissioning or commissioning on oil, gas, petrochemical and power projects
Format
9 self-paced modules, about 2 hours of lessons and practice, plus about 2.5 hours of optional video, written notes, a practice task per module and one final assessment.
Level
Beginner. Beginner to intermediate. For mechanical, piping, electrical and instrument diploma and degree graduates, QA/QC and construction engineers, and technicians moving into completions, pre-commissioning or commissioning on an EPC project. You should know what a pump, a valve and a P&ID are; no completions experience is needed.
Brand
Vendor-neutral
Software
A spreadsheet (LibreOffice Calc is free) for the tag register, the ITR register, the punch list and the calculations. Nothing else is needed. Real projects use a completions database; the course explains what it holds, so you can work in any of them.
Hardware
None. If you work on a construction or commissioning site, the practice tasks are better for it, but every task can be done on paper.
Certificate
Optional EDWartens Certificate of Completion, ₹959 inclusive of GST for learners in India, verifiable by code. Not a vendor credential.
Video lessons by
ICxA, Project Learning Tips & Tricks, Offshore Engineering Academy, CommissioningCoach.com, Piping Knowledge, ALCHEMY ACADEMY, mk, Donaldson Hy-Pro, Acoem USA, Sulzer, The Electrical Guy, instrulogic, Keentel Engineering, The HSE Coach, DesiGn HuB, Mechanical Guider, OQSHA - Quality & Safety, Mechanical Completion - Master Talk, QAQC Files (independent creators, credited below)
Language
English
Last updated
28 November 2026

More free courses: Free project management courses

Classroom course, Bangalore

PLC training in Bangalore

The Automation Engineer Program (AEP) is our classroom course in PLC programming and industrial automation, taught in person at our Electronic City centre.

Credits

Who made the video lessons

The video lessons in this course were created by the people below, not by EDWartens. Every lesson streams from its creator's own YouTube channel; EDWartens neither hosts nor sells that footage, and the creators are not affiliated with EDWartens and do not endorse this course. What EDWartens wrote is the study plan, the notes, the practice tasks and the assessments.

If you are one of these creators and would like a lesson removed or credited differently, write to info@edwartens.co.in.