Automation Insights

Expert articles on PLC programming, SCADA systems, industrial automation, AI for manufacturing and career guides, written by practising engineers at Wartens Automation Pvt Ltd.

Showing 12 of 176 articles

EU Cyber Resilience Act: 24-Hour Reporting Is Now Live
Industry News

EU Cyber Resilience Act: 24-Hour Reporting Is Now Live

Since 11 Sept 2026, makers of PLCs, HMIs, gateways and connected machines sold in the EU must flag exploited flaws within 24 hours. What Indian exporters and PLC engineers must do.

EDWartens Engineering Team
Exide's Bengaluru Lithium Cell Plant: The Jobs It Creates
Industry News

Exide's Bengaluru Lithium Cell Plant: The Jobs It Creates

Exide Energy Solutions has commissioned a 6 GWh lithium-ion cell plant at Devanahalli, Bengaluru. Here is what a cell gigafactory runs on and the PLC, vision and electrical jobs it needs.

EDWartens Engineering Team
World Robotics 2026: India Is Now 6th for Robot Installs
Industry News

World Robotics 2026: India Is Now 6th for Robot Installs

IFR's World Robotics 2026: 5 million robots now work in factories, and India installed about 10,500 in 2025, up 15% and sixth in the world. What it means for robot programming careers.

EDWartens Engineering Team
Factory Cyberattacks 2026: Lines Stopped, PLCs Untouched
Industry News

Factory Cyberattacks 2026: Lines Stopped, PLCs Untouched

Ransomware stopped production at Coca-Cola's Fairlife and disrupted Boston Scientific in 2026, and Dragos logged 1,140 industrial cases in Q2, all via IT. What an automation engineer should do.

EDWartens Engineering Team
India's Data Centre Boom: Electrical and BMS Jobs in 2026
Industry News

India's Data Centre Boom: Electrical and BMS Jobs in 2026

India has 1,789 MW of live data-centre capacity and 3,860 MW more due by 2030, says Cushman & Wakefield. The electrical, BMS, cooling and controls roles it needs, city by city.

EDWartens Engineering Team
PNP vs NPN Sensor Wiring to a PLC, Explained on Video
PLC Training

PNP vs NPN Sensor Wiring to a PLC, Explained on Video

A PNP sensor switches +24 V and needs a sinking input; an NPN sensor switches 0 V and needs a sourcing input. Wiring for S7-1200 1M, Mitsubishi FX and Delta S/S, plus a meter test.

EDWartens Engineering Team
TIA Portal First Project: Step-by-Step Video Walkthrough
PLC Training

TIA Portal First Project: Step-by-Step Video Walkthrough

Create a TIA Portal project, add an S7-1214C, set its IP, write a start/stop rung in OB1, compile with zero errors and archive it. A written walkthrough beside ControlByte's video.

EDWartens Engineering Team
XIC, XIO and OTE in Studio 5000: A Video Walkthrough
PLC Training

XIC, XIO and OTE in Studio 5000: A Video Walkthrough

XIC is true when a bit is 1, XIO is true when a bit is 0, and OTE writes the rung result to a bit every scan. A Studio 5000 walkthrough with a truth table and the NC stop button trap.

EDWartens Engineering Team
Modbus RTU Explained: Registers, Addresses, Frames, CRC
Industrial Automation

Modbus RTU Explained: Registers, Addresses, Frames, CRC

Modbus RTU: one master polls up to 247 slaves over RS-485 using four data tables. Why 40001 means offset 0 on the wire, how a frame and its CRC are built, and how to read a 32-bit value.

EDWartens Engineering Team
3-Wire Start-Stop Motor Starter Wiring, Step by Step
Industrial Automation

3-Wire Start-Stop Motor Starter Wiring, Step by Step

A 3-wire starter uses an NC stop, an NO start and the contactor's 13-14 auxiliary contact to hold itself in, so the motor stays off after a power dip. Full wiring, terminals and tests.

EDWartens Engineering Team
Factory I/O with TIA Portal: Setup Tutorial for Beginners
PLC Training

Factory I/O with TIA Portal: Setup Tutorial for Beginners

Connect Factory I/O to TIA Portal and PLCSIM: build an S7-1200 project, enable simulation, start PLCSIM, pick the S7-PLCSIM driver, map sensors and the conveyor, and run your first rung.

EDWartens Engineering Team
4-20 mA Formula: Convert mA to Pressure, Level, Temp
Industrial Automation

4-20 mA Formula: Convert mA to Pressure, Level, Temp

PV = LRV + (mA - 4) / 16 x span. So 12 mA on a 0-10 bar transmitter is 5 bar. The reverse formula, worked examples, raw PLC counts by brand and NAMUR NE43 limits.

EDWartens Engineering Team

Ready to Start Your Engineering Career?

Stop reading about automation and start doing it. Join EDWartens as a Junior Engineer and get hands-on experience with real PLCs, SCADA systems and industrial projects. Job Guarantee (conditions apply).